Winnovart News

EUR 150 mil. for industrial enterprises to implement investments in renewable energy and high-efficiency cogeneration systems | Winnovart

Written by dccadmindcc | January 20, 2017

EUR 15 mil. grants and funding intensities up to 80% are available for industrial enterprises to implement investments in renewable energy (biomass, biogas and geothermal) facilities, as well as in high-efficiency cogeneration systems.

 

The grants will be available via the Operational Programme for Large Infrastructures (POIM), Priority Axis 6, with the calls expected to be launched at the end of 1st quarter 2017.  a number of two LIOP funding programmes, Measure 6.1. Increasing the energy production from the least exploited renewable energy sources (biomass, biogas and geothermal) and Measure 6.4. Increasing savings from the consumption of primary energy produced from high-efficiency cogeneration systems, which will be launched in the first quarter of 2017.

 

POIM 6.1.Increasing the energy production from the least exploited renewable energy sources (biomass, biogas and geothermal), funding for SMEs and large enterprises whichperform activities in the field of energy, electrical and thermal production.  Eligible projects cannot exceed a total value of EUR 50 mil., with a maximum grant of EUR 15 mil. and funding intensities of 80% for small and micro enterprises, 70% for medium enterprises and 60% for large enterprises.

 

Find more details about this programme, including the eligible activities and funding conditions in our detailed presentation.

 

POIM 6.4. Increasing savings from the consumption of primary energy produced from high-efficiency cogeneration systems, funding for enterprises with an energy consumption exceeding 200 toe/year to implement high-efficiency cogeneration systems modernization/ construction investments.

Grants up to EUR 15 mil. and funding intensities between 60% and 80% depending on project location and company size.

 

Find out more details about the programme eligibility and funding conditions in our programme presentation.

 

For both programmes the eligible regions are: West, North-West, North-East, South-East, South, South-West and Center.

 

Categories: 2017, EU & state aid funding Romania, Uncategorized | Permalink